Altcar Moss Wellsite Planning Application
Non Technical Summary
Planning Statement
Appendix 1 - Site Location Plans Appendix 2 - Site Layout Plans
- Existing Layout Plan (Composite)
- Existing Layout Plan (1 of 6)
- Existing Layout Plan (2 of 6)
- Existing Layout Plan (3 of 6)
- Existing Layout Plan (4 of 6)
- Existing Layout Plan (5 of 6)
- Existing Layout Plan (6 of 6)
- Proposed Construction Layout (Composite)
- Proposed Construction Layout (1 of 6)
- Proposed Construction Layout (2 of 6)
- Proposed Construction Layout (3 of 6)
- Proposed Construction Layout (4 of 6)
- Proposed Construction Layout (5 of 6)
- Proposed Construction Layout (6 of 6)
- Section through Proposed Construction
- Conductor Setting Layout
- Section though Conductor Setting
- Drilling Phase Layout
- Section through Drilling Phase
- Hydraulic Fracturing Phase Layout
- Section through Hydraulic Fracturing Phase
- Initial Flow Test Phase Layout
- Section though Initial Flow Test Phase
- Extended Well Test Phase Layout
- Section though Extended Well Test Phase
- Well Abandonment Phase Layout
- Section though Well Abandonment Phase
- Restoration Phase Layout Plan (Composite)
- Restoration Phase Layout Plan (1 of 6)
- Restoration Phase Layout Plan (2 of 6)
- Restoration Phase Layout Plan (3 of 6)
- Restoration Phase Layout Plan (4 of 6)
- Restoration Phase Layout Plan (5 of 6)
- Restoration Phase Layout Plan (6 of 6)
- Boundary Fencing Plan
Environmental Statement
Appendix A - Scoping Opinion
Appendix B - Air Quality
Appendix C - Archaeology
Appendix D - Ecology
- D1 - Extended Phase 1 Habitat Survey
- D2 - Breeding Bird Report 2018
- D3 - Shadow Habitat Screening Assessment
- D4 - Water Vole Survey 2018
- D5 - Wintering Bird Survey 2013/14
- D6 - Wintering Bird Survey 2015/16
- D7 - Bat Survey 2018
- D8 - Water Vole Survey 2017
- D9 - Ecological Valuation Resources
- D10 - Desktop Study Results
- D11 - Memo: Sound Levels due to Piling
- E1 - Landscape and Visual Assessment Methodology
- E2 - Drawings
- E3 - Viewpoint Photographs and Photomontages
- E4 - Landscape Assessment Tables
- E5 - Viewpoint Assessment Tables
- Hydrogeological Risk Assessment
- Flood Risk Assessment
- Amended Flood Risk Assessment (Part 1)
- Amended Flood Risk Assessment (Part 2)
- Contaminated Land Assessment
Statement of Community Involvement
Response to Regulation 25 Request and Supporting Documents